Unsupported browser

For a better experience, please update your browser to its latest version.

Your browser appears to have cookies disabled. For the best experience of this website, please enable cookies in your browser

We'll assume we have your consent to use cookies, for example so you won't need to log in each time you visit our site.
Learn more

Contract to investigate offshore wind farm sites awarded to Fugro

Fugro and the Netherlands Enterprise Agency, part of the Ministry of Economic Affairs, have signed two contracts to investigate the Borssele wind area, off the Zeeland coast.

The scope of work includes measuring meteorological and oceanographic conditions and performing geophysical investigations of the seabed.

Fugro will measure wind speeds at the future wind farm locations using its Seawatch Wind LiDAR, a device that uses laser beams to collect meteorological data from a floating buoy. This information is crucial for wind farm developers who use the data to calculate as accurately as possible the anticipated yield from the planned wind farms in the Borssele wind farm zone.

The geophysical investigation of the seabed will provide detailed information about water depth, geology and possible obstacles on and below the seabed at Borssele plots III and IV. With these data the best possible design for an offshore wind farm and the construction of the necessary electrical infrastructure can be determined.

The first tender in Borssele starts in December 2015 and the tender for lots III and IV will begin in 2016.

Have your say

You must sign in to make a comment

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Terms and Conditions. Links may be included in your comments but HTML is not permitted.