Unsupported browser

For a better experience, please update your browser to its latest version.

Your browser appears to have cookies disabled. For the best experience of this website, please enable cookies in your browser

We'll assume we have your consent to use cookies, for example so you won't need to log in each time you visit our site.
Learn more

Tenderers sought for third metro line in Toulouse

toulouse metro sign

Documents for the geotechnical services for a third metro line have been published in the Official Journal of the European Union (OJEC).

The Toulouse Aerospace Express, a 27km long line with 20 stations, was unveiled back in 2015 and will connect the Colomiers railway station near the Toulouse-Blagnac Airport on the west through the city centre before ending at Labège in the southeastern suburb of Toulouse.

Tender documents reveal the planned work has been divided over five lots; ground investigation work; test drilling and boring work; geotechnical engineering services; ground investigation services; and geology services.

Work will include core drilling, pressuremeter soundings, shovel surveys, and the associated soil laboratory tests.

The framework contract is for two years and costs are not expected to exceed €4.8M (£4.29M). 

Tenderers must submit their documents by 26 December 2017.

 

Have your say

You must sign in to make a comment

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Terms and Conditions. Links may be included in your comments but HTML is not permitted.